An item in used but good condition. May have minor damage to jewel case including scuffs or cracks, or to the item cover including scuffs, scratches, or cracks. The cover art and liner notes are included for a CD. VHS or DVD box is included. Video game instructions are included. No skipping on CD/DVD.
No fuzzy/snowy frames on VHS tape. See the seller’s listing for full details and description of any imperfections.Seller Notes:“ Please read the description and see the photos provided. 90%-95% of the scratches have been removed. ”Custom Bundle:NoPublisher:BANDAI NAMCO EntertainmentRelease Year:2007Genre:Action & AdventureRegion Code:NTSC-U/C (US/Canada)Platform:Sony PlayStation 3Rating:T-TeenGame Name:Time Crisis 4.
.RAZING STORM OPERATION MANUAL The actual product may differ slightly from the illustrations in this manual. RAZING STORM MANUAL US/EUROPE NOTE:SEE ADDENDUM FOR SPECIFIC EU INFORMATION. DANGER ● To ensure safe operation of the game machine, be sure to read this Operation Manual before use.IMPORTANT Read PRECAUTIONS and INSTALLATION Sections before operating game RF Notice Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operating in a commercial environment.INTRODUCTION Thank you for purchasing the “Razing Storm” game machine (hereafter referred to as the “machine”). This operation manual describes: How to install, operate, relocate, transport, maintain and discard the machine safely and properly How to operate the machine correctly and make full use of its features .Notes.1.
Arcade Parts; Namco; Arcade Parts List. By Manufacturer Five Star Redemption; Adrenaline Amusements. F-ZERO STD; F1Formula; F355 Challenge; F355 TWIN; Family Bowl 2; Fast & Furious Drift. Razing Storm. Ridge Racer 2. Ridge Racer 5. Rockin' Bowl O' Rama. Soul Calibur III. New Listing Reproduction Castlevania: Symphony of the Night (PS1) Manual.; Authentic Suikoden 2 (PS1) Art Insert Only! II; The Legend of Zelda A Link to the Past SNES Super Nintendo REPRO Free.; Mike Tyson’s Punch-Out!! REPRODUCTION Welcome Letter & Other Nintendo Inserts.
SAFETY PRECAUTIONS - Be sure to read these instructions to ensure safety - Instructions to the owner If you entrust another party to perform installation, operation, relocation, transportation, maintenance or discarding of the machine, instruct the concerned party to read and observe all the instructions and precautions in this operation manual regarding the particular action to be taken.1. SAFETY PRECAUTIONS- Be sure to read these instructions to ensure safety - 1-3 Top-priority safety precautions WARNING Should any abnormality occur, turn off the power switch immediately to stop operating the machine. Then, unplug the power cord plug from the AC outlet.1. SAFETY PRECAUTIONS- Be sure to read these instructions to ensure safety - ratings. Operate the machine with a power supply voltage in the range of 105 to 125 VAC. Operating the machine with a supply voltage outside the specified range may cause a fire or electric shock.1.
SAFETY PRECAUTIONS- Be sure to read these instructions to ensure safety - 1-4 Description of warning labels attached to the machine WARNING The warning labels describe important safety precautions. Observe the following: To ensure that the warning labels attached to the machine are easily .1.
SAFETY PRECAUTIONS- Be sure to read these instructions to ensure safety - Rear side of Coin Tower Assy Coin Tower Assy Warning sticker Maintenance Part No.: RM44-13905-00. Internal parts refer to the CPU Board, USIO PC Board, GUN DRIVE PC Board, switching regulators and others.CONTENTS INTRODUCTION 1. SAFETY PRECAUTIONS.1 - Be sure to read these instructions to ensure safety - 1-1 Magnitudes of risk.1 1-2Definitionoftheterm'technician'. 1 1-3 Top-priority safety precautions.2 1-4Descriptionofwarninglabelsattachedtothemachine.4 CONTENTS.6 2. SPECIFICATIONS.10 3.CONTENTS 7-1-2Operationcheck(afterpowerON).41 7-2 How to play.42 7-3Adjustment.44 7-3-1Adjustmentswitches. 44 7-3-2Adjustmentofdisplay.45 7-4Testmode.46 7-4-1 Description of the Menu screen.
46 7-4-2Gamefee/freeplaysetting(COINOPTIONS). 47 7-4-3Gamesetting(GameOPTIONS). 48 7-4-4Switchinput/outputtests(I/OTEST).49 (a)I/OPCBCHECK.50 (b)GUNINITIALIZE1P-2P(GunAssyaimsetting1P-2P).51 (c)SWITCHTEST.54 (d)SOLENOIDTEST.55.CONTENTS 8-2-4 Control Assy - To be conducted by a technician only.76 8-2-5 Gun Assy - To be conducted by a technician only. 77 8-2-6 Pedal Assy - To be conducted by a technician only. 78 8-3RemovingandinstallingAssysandparts.CONTENTS 10-7 Gun Tower Assy.122 10-8 Gun Assy.126 10-9 Pedal Assy.
128 11.WIRINGDIAGRAMS.131 11-1Part1of2-USAWiring. 131 11-2Part2of2-USAWiring. 132 11-3Part1of2-UKWiring.
133 11-4Part2of2-UKWiring. SPECIFICATIONS (1) Rated power supply US 105-125 VAC 60 Hz - Europe 240V 50/60Hz (2) Rated power consumption 460 W (3) Maximum current consumption 6 Amps (4) Coin box capacity Approx. $750 (3,000 25¢ coins) (5) Display device 60-inch DLP projector (6) Dimensions 1.2. SPECIFICATIONS Control Assy 1,520 (W) x 540 (D) x 1,120 (H) mm 1,445 Signboard Assy 1,330 (W) x 390 (D) x 340 (H) mm 1,630 Pedal Assy 250 (W) x 250 (D) x 160 (H) mm (7) Weight 1. As installed 341 kg 2.3. CHECKING THE PACKAGE CONTENTS The product package shipped from the factory contains the following components and parts.
Make sure that all items shown below are contained in the product package. If any item is missing, contact your distributor.
Packaging and accessories Projector Tower Assy Control Assy.3. CHECKING THE PACKAGE CONTENTS Accessory list Name Description Qty. Razing Storm Operation Manual (this manual) Projector Adjustment Manual Maintenance key each (total: 4 keys) Coin box key Shared use Coin insertion sticker (A) 1PLAY $1.00 Power cord Flange socket bolt (M8 x 40).4. OVERALL CONSTRUCTION (Names of Parts) Front side Fluorescent lamp LED sensor cover Projector Assy Side Pillar (L) Assy Gun Assy Front plate door Rack Assy Front door Control Assy Pedal Assy Rear side AC Plate Assy Power switch Fuseholder.5.INSTALLATION WARNING Installthemachineaccordingtotheinstructionsandproceduresspecifiedin thisoperationmanual.Failuretofollowthespecifiedproceduresmayresultin afire,electricshock,injuryormachinemalfunctions. InsertthepowercordplugfirmlyintotheACoutlet.Poorcontactmaycause overheatingthatcanleadtoafireorburns. Besuretoconnectthegroundlead.Ifthegroundleadisnotconnected,electric shockcanresultincaseofelectricalleakage.(SeeP.33'5-6Connectingthe powercordandgroundlead.' ) Installthemachinesecurelybyusingtheleveladjusters.Unstablemachine installationcanresultinanaccidentorinjury.(SeeP.22'5-3-1Adjustingthe leveladjusters.'
) 5-1Installationconditions 5-1-1Locationstoavoid WARNING The machine is designed for indoor use. Never install the machine outdoors or atanyofthefollowinglocations: Placeindirectsunlight Placeexposedtorainorwaterleakage Damp place Dustyplace .5.INSTALLATION 5.INSTALLATION 5-1-2Playzoneforinstalledmachine WARNING Provideaplayzoneshownbelowsothatplayersdonotaccidentallybumpinto observersorpassersby. Provideaspaceofatleast50cmbetweentherearsideofthemachineandthe wallorothermachineinordertoturnthepowerswitchON/OFFandopentheback door for maintenance. 2m70cm or more 50cm or more 50cm or more Play Zone Aisle.5.
INSTALLATION 5. INSTALLATION 5-1-3Preventionofdetectioninterference. If two or more units are installed next to each other, the aim detection systems of the Gun Assys can operate erroneously due to interference.
To prevent this, position the game machines (player side) alternately. Using page 49 as a guide, set the Gun Sensor channel of the first game to “1”.5.INSTALLATION 5-2Requireddimensionsofcarry-inpassage(suchasdoors andcorridors) The game machine is divided into Assys at the factory before shipment. The size of each Assy is as follows: Projector Tower Assy 1,650 (W) x 710 (D) x 1,870 (H) mm Weight: 215 kg Control Assy 1,445 (W) x 920 (D) x 1,050 (H) mm Weight: 94 kg Signboard Assy.5. INSTALLATION 5-2-1SeparatingtheProjectorTowerAssy(whenrequiredduetopassageconditions) -Tobeconductedbyatechnicianonly-.
Ifthecarry-inpassageissufficientlytall,thefollowingprocedureisnotnecessary. WARNING Theprojectorweighsapproximately31kg.Removaloftheprojectorshould beperformedbyatleastthreepersonstopreventaccidents.
Remove the three torx bolts (M5 X 12), then dismount the front plate door. Using the Instructions on P.
79, 8-3-1(1) Replacing the LED Boartd steps through remove the LED Sensor cover from the game. Torx bolt (M5 x 12) Connectors Front plate door.5.INSTALLATION On the pillar, remove the six Torx bolts (M5 x 12) and loosen the bolt on the rear side at the top, then dismount the side pillar cover (R). Disconnect the connector, then remove the four Hex head bolts (with flat and spring washers) (M6 x 20).5. INSTALLATION While one person disengages and lifts the left pillar approximately 25 cm.
Remove the top monitor retention bracket. Next, remove the left monitor retention bracket and slide the projection monitor to the players left, thereby clearing the right rentension bracket. Left and Right monitor retention bracket screws Input Signal cover.5.INSTALLATION 5-3Assembly 5-3-1Adjustingtheleveladjusters After positioning the Projector Assy according to the instructions in “5-1 Installation conditions” on page 15, lower the level adjusters (at 4 locations) until the casters are lifted about 5 mm from the floor (the casters should be able to swivel freely). INSTALLATION 5-3-2AssemblingtheSignboardAssy -Tobeconductedbyatechnicianonly- WARNING TheSignboardAssyweighsapproximately25kg.Theinstallationtaskshouldbe performedbyatleastthreepersonsinasufficientlylargeworkareatoprevent accidents. CAUTION SincetheinstallationoftheSignboardAssymustbeconductedataheight, prepareastepladderorplatformtostandon.Performingthetaskinanawkward positioncanresultininjuryormachinedamage. Using four Torx bolts (M5 x 12) and four flat washers (M5), install the center plate to the front side of the Signboard Assy, making sure that the center plate is positioned on the center plate support.5.INSTALLATION Using four Torx bolts (M5 x 12) and four flat washers (M5), install the side plate (L) to the front side of the left-side speaker.
Side plate (L) Flat washers (M5) Torx bolts (M5 x 12) Using two Torx bolts (M5 x 12), install the side plate (R) to the front side of the right- side speaker.5. INSTALLATION Place the Signboard Assy on the Projector Assy from the front side, making sure that signboard hanger brackets on the top panel of the Projector Assy enter the holes on the bottom surface of the Signboard Assy. Signboard Assy Signboard hanger brackets Move the Signboard Assy toward the back.5.INSTALLATION Connect the left-side connector of the Signboard Assy, and install the signboard door plate, which was removed in step, with two Torx bolts (M5 x 20).
Checkthedirectionandshapeoftheconnectorcarefullyinordertopreventdamage to electrical circuits due to incorrect connector connection. Torx bolt (M5 x 10) Connector Signboard Assy Signboard door plate.5.
INSTALLATION 5-3-3ConnectingtheProjectorTowerAssyandControlAssy -Tobeconductedbyatechnicianonly- Checkthedirectionandshapeoftheconnectorcarefullyinordertopreventdamage to electrical circuits due to incorrect connector connection. Adjust the level adjusters on the Control Assy and align the Projector Tower Assy with the Projector Tower Assy. Secure the Control Assy to the Projector Tower Assy with four flange socket bolts (M8 x 40).5.INSTALLATION Connect the eight connectors. (See the connection diagram below.)Using the nuts mounted to the studs, secure the ground braid and the ground wire (Green-Yellow) from each respective tower to the joint box. Ground wire Ground Braid Connectors Connector Using four Torx bolts (M5 x 12), install the joint box cover which was removed in step To remove, follow the installation sequence in reverse.5.
INSTALLATION 5-3-4InstallingthePedalAssys -Tobeconductedbyatechnicianonly- Using four flange socket bolts (M6 x 12) (2 on each side), mount the housing loosely to each Pedal Assy. Flange socket bolts (M6 x 12) (to be tightened loosely) Flange socket bolts (M6 x 12) (to be tightened loosely) Pedal Assy (Elongated hole) Connect the connector and attach the housing of each Pedal Assy to the Control.5.INSTALLATION Press down on the Pedal Assy so that it contacts the floor firmly, and tighten the temporarily installed four flange socket bolts securely. (Make sure that the Pedal Assy is not lifted off the floor.) (Tighten the bolts.) (Tighten the bolts.) To remove, follow the installation sequence in reverse.5. INSTALLATION 5-4Removingandinstallingthefrontdoor -Tobeconductedbyatechnicianonly- WARNING Toprotecttheservicestaffandotherpeoplefromelectricshock,accidentand injuryandtopreventdamagetotheelectriccircuitryofthemachine,besure toturnoffthepowerswitchbeforeinitiatingthedescribedtask. Remove the two Torx bolts (M5 x 40). Using the provided maintenance key, unlock the lock located at the center of the front door.
The official Football Manager site can be found at and the official forums can be found at.Sports Interactive, the Sports Interactive logo, in-game generated images and any other Football Manager related items are registered trademarks and/or copyright material owned by Sports Interactive, or their respective trademark and copyright holders.SEGA and the SEGA logo are either registered trademarks or trademarks of SEGA Corporation. Football manager 2014 free download apk. Football Manager, Sports Interactive and the Sports Interactive logo are either registered trademarks or trademarks of Sports Interactive Limited.
Dismount the front door. Front door Torx bolt (M5 x 40) To reinstall, follow the removal sequence in reverse.5.INSTALLATION 5-5Insertingthedongle - Tobeconductedbyatechnicianonly- WARNING Toprotecttheservicestaffandotherpeoplefromelectricshock, accident andinjuryandtopreventdamagetotheelectriccircuitryofthe machine, besuretoturnoffthepowerswitchbeforeinitiatingthedescribedtask. Thegameis shippedwiththedongleinstalled,thisinformationis provided forre-installation purposesonly. Thesupplieddongleisdesignedexclusivelyforthisgamemachine.Donotuse thisdongleinanyothermachine.Also,donotusethedongleofanothermachine inthisgamemachine.Failuretoobservethisinstructioncanresultinequipment malfunctions. Besuretoturnoffthepowerswitchbeforeinsertingthedongle. Make sure that the power switch on the Projector Tower Assy is turned off.
Create new and discover new genes as you build up your town! Growing your number of unlocked professions earns you more, new, even MORE professions, some funny names, and maybe even some secrets. Are you up to the challenge to get all too?As of version 1.3.9, there are 349 professions that can be assigned to work, divided into 20 unique, plus 19 special genes that can only be used in splicing, available in the game.Please note that this wiki is specialized for the newly released games in 2019. Professions are the heart and soul of Pixel People. Pixel people download. You begin the game with a and a to get your adventure started.
Remove the front door. 31 “5-4 Removing and installing the front door.”) Insert the dongle into the slot on the left side, making sure that the barcode label on the dongle is facing upward.5. INSTALLATION 5-6Connectingthepowercordandgroundlead WARNING Connectthegroundleadusingoneofthefollowingmethods.Ifthemachineis notgroundedproperly,electricshockcanoccurincaseofelectricalleakage. (1)Useonlythe3Pplugforgroundingthemachine.Donotattempttodefeat thisconnection. Donotuseadaptors.Connectonlytoaproperlygrounded outlet. (1)Using3PACsocket Insert the power cord plug directly into the AC outlet. Power cord plug 3P AC socket.5.INSTALLATION 5-7OptionalDollarBillAcceptor TheCoinDoorAssemblyusedonRAZINGSTORMisequippedtoutilizeadollar billacceptor.Alltherequiredwiringconnectionsareprovidedinsidethegame for this application.
TheCoinDoorcanaccomodatethefollowingDollarBillAcceptor: MEI2000Series.6. MOVING AND TRANSPORTING WARNING Do not leave the machine on a slope. If the machine is left on a slope, it may tip over and cause an unexpected accident. 6-1 Moving (on the floor) When moving the machine, separate the machine into the Projector Tower Assy, Control Assy and Pedal Assys.6.MOVING AND TRANSPORTING 6-2 Transportation 6-2-10 Manual transportation (carrying on stairs, etc.) WARNING When moving the machine, be sure to separate the machine into the Projector Assy, Signboard Assy, Control Assy and Pedal Assys.
Moving the machine without disassembly can result in an accident or injury.6.MOVING AND TRANSPORTING 6-2-2 Loading on or unloading from a vehicle WARNING When moving the machine, be sure to separate the machine into the Projector Assy, Signboard Assy, Control Assy and Pedal Assys. Moving the machine without disassembly can result in an accident or injury. (See P.6.MOVING AND TRANSPORTING 6-2-3 Trucking WARNING When transporting the machine on a vehicle, secure the machine to the vehicle in order to prevent it from moving due to acceleration or deceleration of the vehicle. Failure to tie the machine securely to the vehicle may result in an accident.7. OPERATION WARNING Should any abnormality occur, turn off the power switch immediately to stop operating the machine. Then, unplug the power cord plug from the AC outlet.
Operating the machine without correcting abnormalities can result in a fire or accident.7. OPERATION 7-1 Pre-service check Check the items described below before commencing operation. If any problem is found, take corrective measures by referring to “8-2 Troubleshooting” on page 73.
7-1-1 Safety check (before power ON) WARNING. To prevent accidents and injury, be sure to check the following items before commencing operation.7. OPERATION 7-1-2 Operation check (after power ON) Check the following items after turning on the power switch. (1) Check sound reproduction. (Is sound produced by each speaker?) (See P. 60 “7-4-6 Sound test (SOUND TEST).”) (2) Check the fluorescent lamp in the Signboard Assy. (Is the fluorescent lamp ON?) (3) Check the LED-Edge PC Board.7.
OPERATION 7-2 How to play CAUTION If a player becomes sick due to game images or light stimulation, have the person stop playing the game immediately and let him/her rest. In rare cases, stimulation by lights or video images can cause convulsion or a loss of consciousness.7.
OPERATION (4) Special weapons When the player’s points reach a certain level, the player’s weapon automatically changes from the machine gun to a different weapon. When this weapon change occurs, a new weapon is shown on the screen. The vibration that the player feels when using the weapon also changes according to the type of weapon used.7. OPERATION 7-3 Adjustment 7-3-1 Adjustment switches Open the service door on the Coin Tower Assy to access the adjustment switches.
Coin Tower Assy ( a ) SERVICE ( d ) E TE ( c ) SELECT ( b ) TEST CO N METER Service door.7. OPERATION 7-3-2 Adjustment of display The projector is adjusted for optimum condition for the game machine before shipment. Ordinarily the projector does not require readjustment at the installation site.
Please Note: If the projector does require readjustment, please contact Namco for the appropriate instructions.7. OPERATION 7-4 Test mode 7-4-1 Description of the Menu screen Open the service door on the Coin Tower Assy and set the Test switch to ON.The Menu screen appears. MENU COIN OPTIONS Setting of game fee,etc. GAME OPTIONS Setting of game details See 7-4-3.7. OPERATION 7-4-2 Game fee/free play setting (COIN OPTIONS) This screen is used to set the game fee and free play option. Select “COIN OPTIONS” in the Menu screen and press the Enter switch.
The Coin Options screen appears. COIN OPTIONS DEFAULT IN GREEN 4 COIN ( S ) 1 CREDIT GAME COST.7. OPERATION 7-4-3 Game setting (GAME OPTIONS) This screen is used to set game details.
Select “GAME OPTIONS” in the Menu screen and press the Enter switch. The Game Options screen appears. Default settings are shown in green, except for HIT-COLOR. For the HIT-COLOR parameter, GREEN and RED indicate the color of damage display.7.
OPERATION 7-4-4 Switch input/output tests (I/O TEST) This screen is used to test the switches. Select “I/O TEST” in the Menu screen and press the Enter switch. The I/O Test screen appears. I/O TEST I/O PCB CHECK GUN INITIALIZE 1P GUN INITIALIZE 2P SWITCH TEST SOLENOID TEST.7.
OPERATION (a) I/O PCB CHECK This screen is used to check the I/O PC Board. I/O TEST I/O PCB: CONNECT OK This screen is used to check the I/O PC Board. BNGI.: US1001: Ver 1.00: JPN,Multipurpose with PPG. Indicates the status of the PCB.7.
OPERATION (b) GUN INITIALIZE 1P-2P (Gun Assy aim setting 1P-2P) This screen is used to adjust the aim of the Gun Assys. Select “GUN INITIALIZE 1P” or “GUN INITIALIZE 2P” in the I/O Test screen and press the Enter switch. The Gun Initialize screen (1) appears.7. OPERATION Press the Service switch (or press the pedal) while the display is showing the Gun Initialize screen (1) to activate to the Gun Initialize screen (2). Then, adjust the aim of the Gun Assy.
This mode enables the adjustment of minor deviation resulting from the installation conditions or individual characteristics of the Gun Assy light receiving unit and LED Board.7. OPERATION To adjust the gun aim, follow the procedure described below. Be sure to hold the Gun Assy straight. Do not tilt the Gun Assy. Hold the Gun Assy toward the screen so that the rear sight notch aligns with .7. OPERATION (c) SWITCH TEST This screen is used to test the switches for proper operation. I/O TEST COIN SERVICE TEST UP SELECT DOWN SELECT GUN TRIGGER 1P GUN TRIGGER 2P FOOT PEDAL 1P FOOT PEDAL 2P 1P START 2P START UP SELECT+ENTER:EXIT Switch Test screen The Switch Test screen shows the statuses of the switches.7.
OPERATION (d) SOLENOID TEST I/O TEST SOLENOID TEST PULL GUN TRIGGER TO ACTION EXIT ENTER SW: ENTER Solenoid test screen When the trigger of the Gun Assy is pulled, the vibration of the Gun Assy is activated. Select “EXIT” and press the Enter switch to return to the This screen is used to test the vibration of the Gun Assy.7. OPERATION (e) LED TEST This screen is used to test the LED-Edge PC Board and illuminated switches. LED TEST LED(SIDE 1P) LED(SIDE 2P) LED(GUN 1P) LED(GUN 2P) 1P START 2P START EXIT SELECT SW: CHOOSE ENTER SW: ENTER LED Test screen Using the Select switch, choose an item to execute, then press the Enter switch.7. OPERATION (f) GUN SENSOR CH This screen is used to change the channel for the aim detection system of the Gun Assy. Select “GUN SENSOR CH” on the I/O Test screen and press the Enter switch.
Using the Select switch, change the setting of the item. After changing the setting, press the Enter switch to return to the I/O Test screen.7.
OPERATION (g) GUN SENSOR CHECK This screen is used to test the LED Boards. 1P:OK 1P:OK 1P:OK 1P:OK 1P:NG 2P:- 2P:- 2P:- 2P:- 2P:- GUN SENSOR TEST AIM AT CENTER OF THE CROSSAND PRESS PEDAL ENTER SW: EXIT 1P:OK 1P:OK 1P:OK.7.
OPERATION 7-4-5 Monitor test (MONITOR TEST) This screen is used to make various monitor adjustments. Select “MONITOR TEST” in the Menu screen and press the Enter switch. The Monitor Test screen appears. MONITOR TEST GRADATION CROSSHATCH VIEW ANGLE FULLWHITE EXIT SELECT SW: CHOOSE ENTER SW: ENTER Monitor Test screen.7. OPERATION 7-4-6 Sound test (SOUND TEST) This screen is used to adjust the sound level and conduct a stereo check.
Select “SOUND TEST” in the Menu screen and press the Enter switch. SOUND TEST DEFAULT IN GREEN VOLUME GAME 15 8 ATTRACT 15 8.7. OPERATION ● Projector Tower Assy Left speaker Right speaker ( LEFT ) ( RIGHT ) 1P-side SE speaker 2P-side SE speaker ( 1P SE ) ( 2P SE ) Woofer speaker ( WOOFER ) ● Control Assy Voice speaker (VOICE ) After changing the setting, press the Enter switch to return to the item selection screen.7. OPERATION 7-4-7 Game data display/initialization (BOOKKEEPING) This screen is used to display various game data.
Select “BOOKKEEPING” in the Menu screen and press the Enter switch. The Bookkeeping screen appears. Using the Select switch, choose “NEXT” or “PREVIOUS” and press the Enter switch to display the next or previous page.7. OPERATION 7-4-8 Others (OTHERS) This screen is used to initialize the backup memory. Select “OTHERS” in the Menu screen and press the Enter switch. The Others screen appears.
OTHERS DEFAULT IN GREEN RST100-2-NA-MPR0-A ( a ) CLOCK (MON) 22: 12: 44 ( b ) 056 ( c ).7. OPERATION Press the Enter switch to execute the selected item. When “(a) HD CHECK” is selected and executed, the HD Check screen appears. (See page 65.) When “BACKUP MEMORY INITIALIZE” is selected and executed, a message “BACKUP MEMORY INITIALIZE?” appears and the screen prompts for the input of “YES”.7.
OPERATION (a) HD CHECK This screen is used to check the hard disk and set the internal clock. HD CHECK DRIVE CHECK (1) Checking the hard disk CLOCK SETTING (2) Setting internal time clock EXIT SELECT SW: CHOOSE ENTER SW: ENTER HD CHECK screen Using the Select switch, choose an item.7. OPERATION (2) CLOCK SETTING This screen is used to set the internal clock. CLOCK SETTING CLOCK SUN 19:28:56 YEAR 08+2000 ( a ) MONTH ( b ) ( c ) HOUR ( d ) MINUTE 28 ( e ) ( f ) EXIT SELECT SW: CHOOSE ENTER SW: ENTER.7.
OPERATION 7-4-9 Software update This screen is used to update the software. (This mode is not used under normal conditions.) SOFTWARE UPDATE UPDATE EXIT SELECT SW: CHOOSE ENTER SW: ENTER SOFTWARE UPDATE screen Select “EXIT” and press the Enter switch to return to the Menu screen.7. OPERATION 7-5 Cleaning Do not use organic solvents such as alcohol and acetone for cleaning. Organic solvents can cause deterioration of materials. Do not use alkaline or acidic detergents.
7-5-1 Cleaning the Gun Assys Do not use a detergent or chemical for cleaning sensor section. Be careful not to scratch the sensor section.7. OPERATION 7-5-3 Cleaning the projector screen Do not use organic solvents such as alcohol and acetone for cleaning. Do not use alkali or acidic detergents. The projector screen is made of acrylic resin and it can get scratched easily. To clean the projector screen, soak a soft cloth in cold or lukewarm (40 degC or lower) water, wring thoroughly, and wipe lightly along the direction of grooves.8.MAINTENANCE WARNING To protect the service staff and other people from electric shock, accident and injury, be sure to turn off the power switch before conducting maintenance work (troubleshooting, repair, etc.). 8-1 Inspection and maintenance WARNING Conduct maintenance periodically.
Failure to conduct periodic inspection may result in unexpected accidents.8.MAINTENANCE 8-1-2 Maintenance items (1) Supplying grease to the plungers in the Pedal Assys - To be conducted by a technician only -. The following describes the procedures to remove and reinstall parts on the (L) side.
The parts on the (R) side can be removed and reinstalled by following the same procedures.8.MAINTENANCE Remove the four flange socket bolts (M6 x 12), which were loosened in step and dismount the housing. Housing Flange socket bolt Flange socket bolt (M6x12) (M6x12) (Slot) Remove the four Torx bolts (M5 x 12) and dismount the cover.
Torx bolt (M5 x 12) Torx bolt (M5 x 12) Cover (M).8.MAINTENANCE Remove the four countersunk washer nuts (M4) from the holder, then lift the holder while pulling the plunger. Wipe off grease from the plunger and the plate on the pedal side.
Apply grease to the plate and the plunger surface areas that contact the holder and plate.8.MAINTENANCE 8-2 Troubleshooting WARNING To protect the service staff and other people from electric shock, accident and injury and to prevent damage to the electric circuitry of the machine, be sure to turn off the power switch before initiating the described task. If the generated problem does not apply to any symptom described in '8-2 Troubleshooting'.8.MAINTENANCE 8-2-2 Projector Tower Assy - To be conducted by a technician only - Symptom Cause Remedy Page.The projector does not display.The connector that connects the.Open the maintenance door and projector to the Rack Assy is images. Connect the connector.8.MAINTENANCE 8-2-4 Control Assy - To be conducted by a technician only - Symptom Cause Remedy Page Page 28, 81,.The LED-Edge PC Board does.The connector is disconnected.Connect the connector. 90 & 94 not light up. (inside the control panel, inside the gun tower).The LED-Edge PC Board is faulty.8.MAINTENANCE 8-2-5 Gun Assy - To be conducted by a technician only - Symptom Cause Remedy Page.Gun shots are not normal.The gun aim is misaligned.Adjust the gun aim. Page 51.The gun muzzle section is dirty.
Page 68.The filter sections are dirty. The USIO PC Board is faulty. Replace the USIO PC Board. Page 94 USB-KEY ERROR.
Incorrect USB key is inserted. Insert the 'Razing Storm' USB key. (INVALID KEY) Page 32 USB-KEY ERROR. The USB is not inserted.8.MAINTENANCE 8-3 Removing and installing Assys and parts 8-3-1 Projector Tower Assy (1) Replacing the LED Board - To be conducted by a technician only - WARNING To protect the service staff and other people from electric shock, accident and injury and to prevent damage to the electric circuitry of the machine, be sure to turn off the power switch before initiating the described task.8.MAINTENANCE Disconnect the connector, remove the four Torx bolts (M5 x 12), then dismount the LED sensor cover. Remove the two hexagon nuts (M3) from the LED Board to be replaced and disconnect the two connectors, then dismount the LED Board. Front side LEDs(red dots) Torx bolt.8.MAINTENANCE (2) Replacing the Rack Assy - To be conducted by a technician only - WARNING To protect the service staff and other people from electric shock, accident and injury and to prevent damage to the electric circuitry of the machine, be sure to turn off the power switch before initiating the described task.8.MAINTENANCE Loosen the three countersunk washer nuts (M6) in the back, remove the three countersunk washer nuts (M6) from the front side, then dismount the Rack Assy.